Build Material Planner

8x8 Concrete Slab, 4 Inches Thick

Poured 4 in thick, a 8 × 8 ft slab covering 64 sq ft needs about 0.87 cubic yards of concrete once 10% is added for waste. For ready-mix, order 1 cu yd for the 8x8, about $200 – $290 delivered, short-load fee included. Bagged, the same 8x8 is 40 80 lb or 53 60 lb bags, about $265 – $371 for the concrete alone.

Ready-mix order
1 cu yd
Ready-mix cost
$200 – $290
80 lb bags
40
Bag cost
$265 – $371

Materials only for a 8x8 at 4 in, from national price ranges as of 2026-09; not a live quote.

What fits on an 8x8 slab

An 8 by 8 square is about the smallest pad that holds a garden shed, a grill station with a little elbow room, or a fire-pit seating spot for two chairs.

Most 8x8 storage sheds sit right on a pad that matches their footprint, so the shed walls land on the slab edge; a pad an inch or two bigger on each side keeps the sill plate from hanging over.

People also pour 8x8 for a small hot tub, but a tub that is already 7 to 8 ft across leaves no walking room and no place for steps, so most hot-tub owners go a size or two larger.

A 4 in 8x8 pour: check first

  • Measure the shed floor frame, not the roof overhang, when sizing the pad.
  • Set anchor bolts in the wet concrete if the shed kit calls for them; drilling later works too but costs more.
  • Leave a gravel strip around the pad so splashback from the roof doesn't rot the siding.
Advanced assumptions (optional)
Concrete slab Wire mesh Gravel base Subgrade (compacted soil)

Full plan for a 8x8 slab, 4 in

Area
64 sq ft
Thickness
4 in
Volume
0.87 cu yd

Bagged concrete estimate (DIY)

$327 – $472

Est. as of 2026-09 — not a live quote

Ready-mix delivered, incl. short-load fee (materials only)

$200 – $290

Est. as of 2026-09 — not a live quote

For a pour this size, ready-mix delivery is typically more practical than mixing bags by hand.

Shopping list

  • Concrete mix (60 lb bags) Or 79 × 40 lb, 63 × 50 lb or 40 × 80 lb bags. 53 bags
  • Ready-mix concrete Alternative to bagged mix; most suppliers have a 1 cu yd order minimum. 1 cu yd
  • Compactable gravel sub-base 4 in compacted base beneath the slab. 1.07 tons
  • 6x6 welded wire mesh Reinforcement for crack control; not a substitute for engineered rebar on structural slabs. 71 sq ft

Email me this plan

Get the shopping list, cost range and next steps in your inbox, to have at the store or when you talk to a contractor. Free.

Buy bagged concrete

Pick up bagged mix and reinforcement from a hardware store for smaller pours.

View shopping list

Get matched with a local concrete contractor

Rather not do it yourself? Tell us where the project is. We'll email you a copy of your request, and a local pro we work with may reach out if they cover your area. Free, and no obligation.

Assumptions

  • Waste allowance: 10% applied to account for over-excavation and spillage.
  • Approx. wet weight: 3,520 lb (1.8 tons).
  • Prices are national-average retail/delivery ranges as of 2026-09, not live quotes.
  • Ready-mix orders under 10 cu yd usually carry a short-load fee; the ready-mix range includes a flat $60-$110. Some suppliers charge per yard instead, so ask for the full fee schedule.

Bags or ready-mix for a 8x8 slab, 4 in?

23.5 cu ft for a 8x8 is still workable in bags: 40 80 lb bags is a few hours of mixing, and a rented drum mixer makes it easier. Ready-mix has a 1 cu yd minimum, about 13% more than the 8x8 needs, plus a short-load fee, so it costs $200 – $290 against $265 – $371 in bags. The bag and ready-mix ranges overlap on a 4 in 8x8, so call one supplier about 1 cu yd and check the shelf price of 40 bags before you choose.

Is 4 in thick enough for a 8x8 slab?

4 in is the usual thickness for a 8x8 patio, walkway, shed floor or equipment pad that carries foot traffic.

Control joints for a 8x8 slab at 4 in

Like any slab, a 4 in 8x8 shrinks while it cures; control joints decide where its cracks go. The usual rule (ACI and PCA guidance) puts joints in a 8x8 at 4 in every 8 to 12 ft, 24 to 36 times the thickness, cut 1 in deep (a quarter of the thickness) as soon as the surface takes the saw without raveling, usually within the first day.

No side of a 8x8 slab is longer than 10 ft, so at 4 in it can go without an interior joint. Tool one across the middle of the 8x8 anyway if you want a straight line for any crack to follow.

How much a 8x8 slab 4 in thick weighs

At roughly 150 lb per cubic foot of wet concrete, a 8x8 at 4 in puts about 3,520 lb (1.8 tons) on the ground. As bags, the 8x8 is 40 80 lb bags, 3,200 lb in all: about 3 trips in a pickup carrying 1,500 lb a load. For that many trips with the 8x8, check the payload on your truck's door-jamb sticker, or have the store deliver the pallets for a fee.

The 8x8 at 4 in against nearby sizes

Every row uses the same 10% waste and prices as the 8x8 at 4 in; costs are for the concrete only.

Slab Cu yd 60 lb bags 80 lb bags Ready-mix order Bags cost Ready-mix cost
4x4 slab, 4 in 0.22 14 10 1 cu yd $70 – $98 $200 – $290
8x8 slab, 4 in (this page) 0.87 53 40 1 cu yd $265 – $371 $200 – $290
8x10 slab, 4 in 1.09 66 49 1.25 cu yd $330 – $462 $235 – $335

Questions about a 8x8 slab, 4 in

How many bags of concrete for a 8x8 slab 4 inches thick?

A 8x8 slab at 4 in takes about 40 80 lb bags or 53 60 lb bags (or 63 50 lb, 79 40 lb), with 10% added for waste: 23.5 cubic feet in all.

How many yards of concrete for a 8x8 slab 4 inches thick?

0.87 cubic yards with waste (0.79 without) for a 8x8 at 4 in. Round the 8x8 order to 1 cu yd: plants batch in quarter yards and most won't send less than a yard.

How much does a 8x8 concrete slab 4 inches thick cost?

Concrete alone for the 8x8 runs about $200 – $290 for 1 cu yd of ready-mix delivered, short-load fee included, or $265 – $371 for 53 60 lb bags. Add a 4 in gravel base and wire mesh and the bagged 8x8 plan comes to $327 – $472. Labor, forms and finishing for a 8x8 at 4 in come on top of these national ranges (as of 2026-09), which are not quotes.

How much does a 8x8 concrete slab 4 inches thick weigh?

About 3,520 lb (1.8 tons) of wet concrete for the 8x8, at 150 lb per cubic foot. The 40 80 lb bags for a 8x8 weigh 3,200 lb: about 3 trips in a pickup carrying 1,500 lb a load.

Where do control joints go on a 8x8 slab 4 inches thick?

On a 8x8 at 4 in, every 8 to 12 ft (24 to 36 times the thickness), sawn 1 in deep. No side of a 8x8 slab is longer than 10 ft, so at 4 in it can go without an interior joint. Tool one across the middle of the 8x8 anyway if you want a straight line for any crack to follow.

Limitations

The 8x8 figures at 4 in are material estimates and typical price ranges, not a quote or a structural design. Confirm that 4 in, the reinforcement and the joint layout suit your soil, loads and local code for a 8x8 slab with a qualified professional.